  Task Pri. Progress             % Cost (est.) Comments
Hull
repair damage to bottom of keel 1                     60 0   needs another layer of glass
replace propeller nut 1                     100 10   damaged thread also repaired
add sacrificial zinc to prop shaft 1                     0   10 need to figure out how to attach
compound, buff and wax topsides 1                     0      
remove and clean propeller 1                     100 100   prop still needs final buffing?
remove name 1                     100 0    
repair gelcoat cracks 1                     0      
apply new name 1                     0   50 "Saba" is the name
* remove bottom paint 1                     30 70   tough going
apply new coat of bottom paint 1                     0 70   purchased red ablative paint
reinforce crack near top of rudder 1                     0      
repair minor damage to bottom of rudder 1                     100 0    
build out area that holds cutlass bearing 2                     100 0    
apply cove stripe 2                     100 15    
apply new boot top 4                     0      
Deck and Rigging
repair bow pulpit 1                     80 50   welded in Hingham
repair stern pulpit 1                     80 50   welded in Hingham
rebed stanchion bases 1                     100     two of these leak?
rebed handrails 1                     100      
rebed bow and stern pulpits 1                     100      
rebed/install chain plates 1                     0      
* sand and varnish all teak 1                     30     making progress
seal all gelcoat cracks 1                     0      
replace fuel through-hull 1                     100 35   ss
compound, buff, and wax deck 1                     0      
replace running rigging 1                     100 342   good deal from Cajun Ropes
replace compass 1                     20 109   still need to install
overhaul and grease winches 1                     70 0   cockpit winches all set; deck and mast to do
replace sliders for companionway hatch 1                     100 10   used narrow strips of teak bought last year
build out drop-boards rails 1                     100     drop boards were too loose
replace both hatches 1                     100 415   new Vetus hatches look mighty nice
replace two stbd stanchions 1                     100 100   bent from an accident; bought new ones
rebed mast step 1                     100     also drilled a weep hole
* add through-deck fitting for waste 1                     20 20   bought SS fitting
make new sail and tiller covers 2                     0   50  
puchase new anchor 3                     100 150   25# CQR with 35' chain and 120' line
rebed water through-deck fittings 3                     0      
add anchor roller 3                     20 170   purchased; good deal from Hamilton Marine
add through-deck fitting for anchor rode 3                     20 30   purchased
Engine/Under Cockpit
* replace fuel tank 1                     100 247    
install new batteries 1                     0   120  
re-wire where necessary 1                     0      
* rebuild water lock / muffler platform 1                     100      
re-attach muffler 1                     100     the hose is a tough one to get on
* replace cutlass bearing and shaft coupling 1                     90 100   just need to fasten
replace/recondition stuffing box 1                     100 0   no need; just needed new packing
* replace engine mounts 1                     80 179   installed; just needs tightening/adjustment
align engine 1                     0 0    
add transmission fluid; check for leaks 1                     100 0   surveyor thought old fluid smelled burnt
repair transmission leak 1                     0     maybe it won't leak when it's at normal level?
replace exhaust hose 1                     80 75   just need to clamp
paint bilge aft of engine 2                     100 20   used Bilgekote; looks nice
replace all fuel hoses 2                     20 100   decided not to replace hoses after filter
rebuild water pump 2                     0     apparently leaks some
add raw water filter 3                     0   100  
overhaul or replace manual bilge pump 4                     0 20   purchased overhaul kit, but pump works fine
* build sail locker workshop 4                     0     build small bench, seat, and shelf
Head
* add holding tank 1                     60 150   platform built
* secure 2nd water tank 1                     80     just needs fastening
replace w tank hose; add hose to galley sink 1                     20     new hose purchased
overhaul and repair toilet 1                     90 98   just need to reinstall
* replace/add toilet/holding tank hoses 1                     0      
add teak and holly flooring 2                     30     I've got extra; why not use it here
convert sink area to storage 4                     0     not sure yet if I want to do this
Electrical and Related
install VHF radio 1                     20 160   purchased; need to install
install GPS                       20     purchased; need to install
replace galley area dome lights 1                     0     purchased; need to install
repair antenna wire;rewire if nec. 1                     0      
replace masthead light lens 1                     100 10   replaced, and the light works
repair anchor and deck lights 1                           corroded; neither work
replace broken/worn nav light lenses 1                     20 15   just need to install stern light lens
replace connectors of all mast wires 1                     0     damaged when mast was unstepped
tag up loose wires 1                     0      
replace v-berth cabin lights 2                     0     may use old dome lights?
* replace electrical panel 2                     10 209   purchased; need to install
replace cabin lights, bulkhead 4                     0 65   purchased; need to install
Cabin
clean interior and bilge 1                     70 0   getting there
repair chainplate holes 1                     100     plan to use epoxy to fill in damage
reupholster cushions 1                     90 1400   came out great; still need to sew on velcro strips
replace overhead cabin lights 1                     20 50   purchased
paint behind setees and cabinet spaces 1                     100     now looks very clean
paint under settees 2                     20     cleaned
apply vinyl liner behind setees 2                     100 0   used liners that were in cabinets
replace lenses on opening portlights 2                     20 140   just need to install
varnish removable woodwork 2                     90 15   almost there
varnish attached interior woodwork 2                     100 40   6 coats applied
* replace cabin sole 2                     70 120   just need to varnish and install
paint cabin sole 2                     100 0   it'll look better when wood sole is removed
paint interior side of companionway hatch 2                     100 0 0 used Benamin Moore oil-based paint
* reconstruct cover over starbd shelf 2                     70     cut; needs final shaping
paint stove trim 3                     100     stripped it instead; looks good
* rebuild rotted shelves above Vberth 3                     100 20    
add foot pump to galley sink 3                     20 20   purchased; need to install
rebuild rotted cabinetry behind sink 4                     0      
replace formica counter tops 4                     0      
replace plexiglass on fixed portlights 4                     0     doesn't disassemble easily
Mast
check mast step support 1                     100 0   seems sound, though may be leaking?
create water channel under mast support 2                     100     drilled a weep hole instead
replace spreader boots 2                     10 40   need to install
replace windex 2                     90 10   need to install; bought cheap brand
Sails
repair working jib 1                     100 96   sent to Hallett Sails for repair
repair remaining sails 1                     0 0   stitching needed; will do myself
Misc To-Buy
Orion flare kit 1                     x 58    
life preserver cushions 1                         50  
winch handle holder 1                     x 18   need to install
cowl vents 1                     x 50   need to install
fenders and docklines 2                         100  
oil lamp 2                     x 60   lamp and gimballed mount purchased
Lifesling 2                     x 20   bought horseshoe instead
                                 
Total listed cost 5351
Total estimated to-buy 480
What I've actually spent 4500
Total: actual + estimated 4980
* indicates multi-step or "big" projects 27-Oct-08